Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request
Academic Journal

Analisis Penjadwalan Kegiatan Pengerukan pada Proyek Pembangunan Pelabuhan Bias Munjul

Subjects: Teknik industri; Buffer Critical Path Method (CPM); Critical Chain Project Management (CCPM)

  • Source: Journal of Manufacturing in Industrial Engineering & Technology; Vol 1, No 2 (2022): Journal of Manufacturing in Industrial Engineering & Technology; 38 - 50

Record details

×
Academic Journal

Using Ant Algorithm to Find the Optimal Critical Path of a Projects Network

Subjects: ant colony optimization (aco); critical path method (cpm); projects networks

  • Source: Al-Rafidain Journal of Computer Sciences and Mathematics, Vol 15, Iss 1, Pp 115-130 (2021)

Record details

×
Academic Journal
×
Academic Journal

Analisis Perbandingan Penjadwalan Menggunakan Critical Path Method (CPM) dengan Precedence Diagram Method (PDM) (Studi Kasus : Proyek Pembangunaan SD Negeri 5 Pecatu)

Subjects: Kegiatan Kritis; Critical Path Method (CPM); Precedence Diagram Method (PDM)

  • Source: Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi; Vol. 4 No. 1 (2021); 56 - 61 ; Jurnal Ilmiah Telsinas; Vol 4 No 1 (2021); 56 - 61 ; 2621-5276 ; 10.38043/telsinas.v4i1

Record details

×
Academic Journal

PENGENDALIAN PROYEK KONSTRUKSI GEDUNG MENGGUNAKAN CRITICAL PATH METHOD (CPM) DAN EARNED VALUE METHOD (EVM)

Subjects: Biaya; Waktu; Critical Path Method (CPM)

  • Source: Jurnal Teknika: Jurnal Teoritis dan Terapan Bidang Keteknikan; Vol. 5 No. 2 (2022): Jurnal Teknika: Jurnal Teoritis dan Terapan Bidang Keteknikan, April 2022; 65-72 ; 2622-3317 ; 2620-8334 ;

Record details

×
Academic Journal

DESAIN KURIKULUM MAHASISWA TEKNOLOGI INFORMASI UIN WALISONGO MENGGUNAKAN CRITICAL PATH METHOD (CPM)

Subjects: Kurikulum; Critical Path Method (CPM)

  • Source: Walisongo Journal of Information Technology; Vol 4, No 1 (2022): Walisongo Journal of Information Technology; 53-62 ; 2715-0143 ; 2714-9048

Record details

×
Academic Journal

PERBANDINGAN MANAJEMEN WAKTU DAN BIAYA PADA PELAKSANAAN PEMBANGUNAN JEMBATAN NAVERBOY

Subjects: Critical Path Method (CPM); Jaringan Proyek; Jalur Kritis

  • Source: Journal of Portal Civil Engineering; Vol 3 No 1 (2020): e-ISSN: 2621-6361 - Journal of Portal Civil Engineering; 73 - 78

Record details

×
  • 1-10 of  37 results for ""critical path method (cpm)""